
It took me eight days to use up two skeins of 160m, two of 120m and four of 70m plus a little white yarn extra. In the beginning, I had to frog one evening's work because it was wonky (I wasn't paying enough attention to the tutorial video and the thing kept increasing in width, not good!).

I still need to measure the finished product but it's wide and long enough to be a shawl that keeps me warm on evenings spent on my terrace.
No comments:
Post a Comment